Politics
Ray Nitschke Bridge Closures Will Increase Green Bay Commute Times Through 2026
Green Bay drivers and boat operators face adjusted schedules and staged restrictions on the Ray Nitschke Memorial Bridge through October 2026, which city announcements indicate could extend commute times and raise daily fuel expenses for local households.
How we reported this

The City of Green Bay Department of Public Works has announced temporary adjustments to the Ray Nitschke Memorial Bridge operating schedule and lane configurations to accommodate construction work on the Fox River crossing at Dousman and Main Streets. From July 20 through October 31, 2026, five barges measuring 50 by 40 feet will be positioned under the fixed spans during weekday daytime hours, while single-lane traffic and one sidewalk will stay open to vehicles and pedestrians. On two specific weekdays in July and September, mariners must give two hours notice to the drawtender, though vessels that fit under the bridge can pass freely at other times.
Construction Timeline and Access Details
Staged lane closures on the bridge itself began July 13 and will continue through October 2026, with no posted detour and access to nearby residences and businesses maintained. Additional street work includes the closure of Hinkle Street south of West Mason Street through July 31 for pavement reconstruction, the shutdown of North Danz Avenue between Morrow and Basten Streets until August 6 for bridge work over Baird Creek, and the ongoing closure of South Adams Street between Doty and Stuart Streets through late August for a sewer project. All operations remain subject to weather changes.
These measures coincide with multiple active projects managed by the Department of Public Works, including the Downtown Interceptors Renewal Project led by NEW Water. The announcements, posted on the city website between June 19 and July 17, 2026, emphasize that the main navigation channel stays unaffected and that bridge operations can continue when needed.
Effects on Daily Household Expenses
Green Bay residents who cross the Ray Nitschke Memorial Bridge for work or errands may encounter added minutes in traffic during peak daytime hours, which analysts note can translate into higher gasoline consumption for repeated trips. Motorists traveling to businesses along the 2200-2300 West Mason Street frontage road will use a temporary right-in right-out access point east of the Hinkle Street closure. Those relying on North Danz Avenue must follow the Morrow Street and North Henry Street detour instead.
The city statements advise drivers to plan for possible backups and to seek alternate routes where possible. No specific dollar figures for added costs appear in the releases, yet the pattern of weekday restrictions and single-lane operation directly shapes how residents allocate time and money for routine travel across the Fox River and through central neighborhoods. Access to homes and commercial properties stays available throughout the work periods.
Further updates on the projects will come through the same Public Works channels as conditions evolve. Residents can monitor the city website for any adjustments to the posted schedules.